718 AP2 Build and Drop Ship Cycle Time

Follow Thread

By Andrew H

  • 0 Likes
  • 2 Replies
  1. What is the production time to build custom AP2 irons with Project X 6.0's and after production how long would it take to drop ship to Seattle?

  2. 19hole

    19hole
    Reading, MA

    IF all of the components for your clubs are in stock, it usually takes 3-5 days to get them assembled. That time can vary with order backlog, right now there are a lot of orders in so I would guess closer to 7-10 days. Shipping time also vary, but FEDEX ground from SoCal to Seattle should only be a couple of days.
  3. Kevin G

    Kevin G
    Dallas, TX

    Just as a reference I ordered custom Ap2 with project x LZ, an Ap3 four iron/T-mb 2 iron same shaft on 9/21 and they have not shipped as of 10/4.

Please login to post a comment.

Sign In

Haven't registered for Team Titleist yet?

Sign Up