I just ordered a whole slew of custom items through my school including:
910D2 Driver with 'ahina 70 X-flex shaft (45.5")
910F*d 3-wood with 'ahina 80 X-flex shaft (43.5")
710AP2 irons (4-P) with KBS Tour X130 shafts +1/2", 1* flat
Our season starts on the 15th of September and I was hoping to have the set for a little while before then so I can break them in before that tournament. Just wondering how long it will probably take for these items to be made and sent out. I'm expecting 3 weeks, is that accurate?
Thanks,
Justin Eimers